1. 西南交通大学 土木工程学院,四川,成都,610031
2. 中国地质调查局 成都地质调查中心,四川,成都,610081
纸质出版:2015
移动端阅览
宋志, 邓荣贵, 陈泽硕. 泥石流堵塞主河试验特征与模式[J]. 水土保持通报, 2015,35(5):100-105.
SONG Zhi, DENG Ronggui, CHEN Zeshuo. Expermental Characteristics and Mode of Debris Flow Blocking Main River[J]. Bulletin of Soiland Water Conservation, 2015, 35(5): 100-105.
宋志, 邓荣贵, 陈泽硕. 泥石流堵塞主河试验特征与模式[J]. 水土保持通报, 2015,35(5):100-105. DOI: 10.13961/j.cnki.stbctb.20151022.001.
SONG Zhi, DENG Ronggui, CHEN Zeshuo. Expermental Characteristics and Mode of Debris Flow Blocking Main River[J]. Bulletin of Soiland Water Conservation, 2015, 35(5): 100-105. DOI: 10.13961/j.cnki.stbctb.20151022.001.
[目的] 分析泥石流入汇主河后对主河的影响以及泥石流堵塞主河的模式机理。[方法] 通过泥石流堵河试验
同时对历史泥石流堵河案例进行调查研究和典型性深入剖析。[结果] 根据泥石流运动过程与淤积形态得出泥石流堵河的3种模式分别为顶冲堰塞堵断模式、渗混堵塞溃决模式、束窄渐进式堵塞模式。对泥石流堵塞主河3种模式的运动与成灾机理进行了初步探索。[结论] 顶冲堰塞堵断模式表现为龙头顶冲对岸、物源塞满主槽、脆弱区渗漏到主体垮塌的特征;渗混堵塞溃决模式表现为短时塞满主槽
水流渗混堵塞
流量加大的特征;束窄渐进式堵塞模式表现为主槽断面束窄、局部流量瞬时加大、渐进式局部堵塞的特征。当前的历史堵河事件以束窄渐进式堵塞为主
与试验统计结果吻合较好。
[Objective] The objective of this study is to analyze the impact of debris flow on the main river and the possibility of debris flow blocking the main river.[Methods] We conducted experiments for the debris flow blocked river tests
and analyzed the debris flow blocking the river cases in history.[Results] Three basic modes of debris flow blocking river were concluded according to debris flow motion and deposition morphology. These modes included top damming block mode
seepage mixed jamming burst mode and narrow beam progressive blocking mode. Based on three modes
we studied the motion and the disaster mechanism of the debris flow blocking river.[Conclusion] The top rushed damming block mode was characterized as the top leading rushed across the side bank
provenance stuffed the main channel and the fragile parts seeped to the collapsed body. The seepage mixed jamming burst mode was characterized as short-term crammed into the main channel
water permeability mixed jam and increased flow. The narrow beam progressive blockage model was characterized as based groove section of narrow beam
local flow transient increasing and gradual local blockage. The current history in the river blocking events is mainly narrow and progressive blockage
and the results agree with the experimental results.
匡尚富.汇流部泥石流的特性和淤积过程的研究[J].泥沙研究,1995,3(1):1-15.
陈德明.泥石流与主河水流交汇机理及其河床响应特征[D].北京:中国水利水电科学研究院,2000.
陈春光,姚令侃,杨庆华,等.基于堰流理论的泥石流堵河模型研究[J].自然灾害学报,2012,21(6):131-135.
陈春光,姚令侃,刘翠容.泥石流堵河条件的研究[J].水利学报,2013,44(6):648-656.
刘翠容,姚令侃.泥石流堵塞大河的特点及异岸受灾判据研究[J].四川大学学报:工程科学版,2012,44(5):93-100.
Liu Cuirong, Du Cui. Characteristic and criteria of debris flow partially blocking big river[J].Journal of Chongqing Jiaotong University:Natural Science, 2014,33(1):79-84.
王峥嵘,邓辉,黄润秋.格地罗沟高频泥石流特征及成因机制研究[J].地下空间与工程学报,2014,10(5):1198-1202.
曾超,崔鹏,葛永刚,等.四川汶川七盘沟"7·11"泥石流破坏建筑物的特征与力学模型[J].地球科学与环境学报,2014,36(2):81-91.
彭秀红,徐佩华.柳杨沟泥石流特征及其工程影响分析[J].工程地质学报,2007,15(3):374-379.
朱平一,程尊兰,游勇,等.川藏公路培龙沟泥石流输砂堵江成因探讨[J].自然灾害学报,2000,9(1):80-83.
宋志,巴仁基,刘宇杰.磨西河特大型泥石流堵塞大渡河分析:以一次泥石流规模、不同频率雨洪法流量定量计算[J].灾害学,2010,25(3):71-73.
地矿眉山工程勘察院.四川省雅安市石棉县广元堡泥石流治理工程补充勘查报告[R].四川眉山:地矿眉山工程勘察院,2011.