Wang Xia. Countermeasures and Characteristics of the Second Phase Project for Major Administration in Yellow River Basin[J]. Bulletin of Soiland Water Conservation, 1996, 15(2): 58-63.
Wang Xia. Countermeasures and Characteristics of the Second Phase Project for Major Administration in Yellow River Basin[J]. Bulletin of Soiland Water Conservation, 1996, 15(2): 58-63.DOI:
The second phase project for the major administration of soil and water conservation in Yellow river basin is accounted summarily.since it is implemented in 1993
the quality
the scale and the criterion have been continuously improved and the benefits more obviously
for the state has attached more importance to soil and water conservation work.Meanwhile
the new situat lon
new characteristics and new problems during the major administration are analyzed.Then
the exist problems are found
and the corresponding countermeasures are formulaed.Therefore
an important instruction is provided for the mayor administrative work and the economical development in the future.