您当前的位置:
首页 >
文章列表页 >
Establishment of Early Warning Model for Flood in Mountainous Area of Beijing City Based on Vertical-mixed Runoff Model
    • Establishment of Early Warning Model for Flood in Mountainous Area of Beijing City Based on Vertical-mixed Runoff Model

    • Bulletin of Soiland Water Conservation   Vol. 36, Issue 3, Pages: 353-357(2016)
    • DOI:10.13961/j.cnki.stbctb.2016.03.060    

      CLC:
    • Published:2016

    移动端阅览

  • SONG Yao, CHENG Jinhua, HU Xiaojing, et al. Establishment of Early Warning Model for Flood in Mountainous Area of Beijing City Based on Vertical-mixed Runoff Model[J]. Bulletin of Soiland Water Conservation, 2016, 36(3): 353-357. DOI: 10.13961/j.cnki.stbctb.2016.03.060.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1196

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Runoff and sediment yield characteristics of typical soil slopes in Xin’an River basin under different rainfall intensities and slope gradients
Characteristics of wind-sand environment and gully entering process in Shajiawan small watershed in middle reaches of Yellow River
Influence of soluble salt content on strength of Ili loess under wet-dry cycle conditions
Spatiotemporal evolution of ecosystem service value in mountain- oasis-desert system of typical arid regions——A case study at Manas River basin
Impact of digital economy on value conversion efficiency of agricultural ecological products in Yangtze River economic belt

Related Author

No data

Related Institution

No data
0