A Comparison of Metheods for Computating Slope Length Based on DEM
|更新时间:2025-03-12
|
A Comparison of Metheods for Computating Slope Length Based on DEM
Bulletin of Soiland Water ConservationVol. 26, Issue 5, Pages: 58-62(2007)
作者机构:
北京师范大学地理学与遥感科学学院,北京,100875
作者简介:
基金信息:
DOI:
CLC:
Published:2007
稿件说明:
移动端阅览
CAO Long-xi, FU Su-hua. A Comparison of Metheods for Computating Slope Length Based on DEM[J]. Bulletin of Soiland Water Conservation, 2007, 26(5): 58-62.
DOI:
CAO Long-xi, FU Su-hua. A Comparison of Metheods for Computating Slope Length Based on DEM[J]. Bulletin of Soiland Water Conservation, 2007, 26(5): 58-62.DOI:
A Comparison of Metheods for Computating Slope Length Based on DEM
Slope length is an important topographic factor.There are various methods to extract the slope length factor of a watershed. Both of grid based direct calculation method and fast calculation method based on the ridge line have been used in practical research in China. Based on the DEM data of the Danangou wa-tershed in Shaanxi Province
this study attempts to make a comparison of precision for the two methods
and analyze the problems that may exist. Results show that direct calculation method has the eligible ratio of 86.9% and model efficiency of 0.520
whereas fast calculation method has the eligible ratio of 69.7% and model efficiency of-0.150. It can be seen that direct calculation method is superior to fast calculation method. This study can serve the further research work on slope length calculation and other related fields.