Discussion on Soil and Water Conservation Plan of Power Transmission Line in Shanxi Province
|更新时间:2025-03-12
|
Discussion on Soil and Water Conservation Plan of Power Transmission Line in Shanxi Province
Bulletin of Soiland Water ConservationVol. 27, Issue 5, Pages: 21-24(2008)
作者机构:
水利部 水土保持植物开发管理中心,北京,100038
作者简介:
基金信息:
DOI:
CLC:
Published:2008
稿件说明:
移动端阅览
SUN Zhong-feng, CAI Jian-qin, WANG Yuan-chang, et al. Discussion on Soil and Water Conservation Plan of Power Transmission Line in Shanxi Province[J]. Bulletin of Soiland Water Conservation, 2008, 27(5): 21-24.
DOI:
SUN Zhong-feng, CAI Jian-qin, WANG Yuan-chang, et al. Discussion on Soil and Water Conservation Plan of Power Transmission Line in Shanxi Province[J]. Bulletin of Soiland Water Conservation, 2008, 27(5): 21-24.DOI:
Discussion on Soil and Water Conservation Plan of Power Transmission Line in Shanxi Province
and main body functions in Shanxi electric transmission line project were analyzed and appraised based on the soil and water conservation plan of electric transmission line project.Analyses indicated that the land purchased for the project was composed of permanent land and temporary land.Permanent land was used for tower footing area and temporary land included construction area
construction roads
and abandoned slag plots.The ratio of permanent land to temporary land was found to be 1∶9.The amount of soil erosion from construction roads was the largest
accounting for 40%~70% of the total amount of soil erosion.Therefore
construction roads were the important prevention and monitoring parts.The area for electric transmission line was divided into the plain area and the mountain and gully area by topographical features.Then they were subdivided into tower footing zone
construction yard zone
construction road zone
and abandonment slag plot zone.According to analysis
the measures in feasibility study report and the system of soil and water conservation were perfect in tower footing zone.However
the system of soil and water conservation was not designed in the temporary zone
and it should be emphasized during comprehensive prevention in the temporary zone.