Methods of Runoff Measurement from Plot Scales -Taking A川iagou Catchment in Din}ci,Gansu as an Example
|更新时间:2025-03-12
|
Methods of Runoff Measurement from Plot Scales -Taking A川iagou Catchment in Din}ci,Gansu as an Example
Bulletin of Soiland Water ConservationVol. 28, Issue 2, Pages: 94-96(2009)
作者机构:
甘肃省定西市水土保持科学研究所,甘肃,定西,743000
作者简介:
基金信息:
DOI:
CLC:
Published:2009
稿件说明:
移动端阅览
CHEN Jin. Methods of Runoff Measurement from Plot Scales -Taking A川iagou Catchment in Din}ci,Gansu as an Example[J]. Bulletin of Soiland Water Conservation, 2009, 28(2): 94-96.
DOI:
CHEN Jin. Methods of Runoff Measurement from Plot Scales -Taking A川iagou Catchment in Din}ci,Gansu as an Example[J]. Bulletin of Soiland Water Conservation, 2009, 28(2): 94-96.DOI:
Methods of Runoff Measurement from Plot Scales -Taking A川iagou Catchment in Din}ci,Gansu as an Example
Plot-scale runoff experiments play an important role in soil and water conservation monitoring
which can not be replaced by other measures. In order to ensuring the accuracy and reliability of the data from the plot scale measurements
it is crucial to finding the most suitable methods regarding monitoring and data analyzing procedures. In the semiarid environment,recognization of rainfall event is significant for distinguishing different runoff events caused by natural rainfall and recording the related hydrological processes simultaneously
especially in consecutive rainy days. However
how to define one single rainfall event in the real world? How long the interval between two parts of rainfall is considered as an independent events How to define the corresponding runoff and erosion caused by such rainfall events? All these important problems need to be solved. The displacement method is tried for treating water samples. The method is relative economical and effective
only need some pycnometer
and the data quality can be ensured. Therefore
we sug- gest using this method,especially in the high erosive regions. Meanwhile
the citation of material and uzilization of information from runoff-plot measurements should be carefully amended and verified