Creating Hydrologically Correct DEMs for Jiangxi Province
|更新时间:2025-03-12
|
Creating Hydrologically Correct DEMs for Jiangxi Province
Bulletin of Soiland Water ConservationVol. 30, Issue 2, Pages: 146-149(2011)
作者机构:
1. 西北大学城市与环境学院
2. 陕西测绘局
作者简介:
基金信息:
DOI:
CLC:
Published:2011
稿件说明:
移动端阅览
LUO Yi-ning, YANG Qin-ke, GU Yun-he, et al. Creating Hydrologically Correct DEMs for Jiangxi Province[J]. Bulletin of Soiland Water Conservation, 2011, 30(2): 146-149.
DOI:
LUO Yi-ning, YANG Qin-ke, GU Yun-he, et al. Creating Hydrologically Correct DEMs for Jiangxi Province[J]. Bulletin of Soiland Water Conservation, 2011, 30(2): 146-149.DOI:
Creating Hydrologically Correct DEMs for Jiangxi Province
This paper discussed the methods to create hydrologically correct DEM(Hc—DEM) at medium resolutions for Jiangxi Province using 1∶250 000 topographic maps and ANUDEM software.The quality of the DEMs was further assessed.The data preprocessing
the determination of the key parameters and others for Hc—DEM creation were addressed carefully.In addition
contour line overlay analysis
random checkpoint analysis and stream network analysis were adopted in evaluation of Hc—DEM quality.The results show that based on the topographic information of the existing digital topographic maps(including contours
spot heights
and streamlines) and the application of ANUDEM software
high-quality DEM representing the correct relationship between the stream networks and the geomorphology could be created.The quality level of constructed DEMs reached the USGS standards.The created DEM had the resolution of 50 m
iteration number of 30 and the second roughness coefficient of 0.5.