您当前的位置:
首页 >
文章列表页 >
Modified Method for Peak Discharge Calculation of Debris Flows in Southwest Area of Tibet
    • Modified Method for Peak Discharge Calculation of Debris Flows in Southwest Area of Tibet

    • Bulletin of Soiland Water Conservation   Vol. 31, Issue 6, Pages: 123-128(2012)
    • Published:2012

    移动端阅览

  • HUANG Kai, CHEN Xiao-qing, LI Qiang, et al. Modified Method for Peak Discharge Calculation of Debris Flows in Southwest Area of Tibet[J]. Bulletin of Soiland Water Conservation, 2012, 31(6): 123-128. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1840

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Process of Debris Flow Dam Break Under Different Conditons
Identification method for large wood in small watershed channels based on segment anything model
Disaster reduction effects evaluation of debris-flow check dam on village buildings——A case study at Heishui gully of Pingwu County, Sichan Province
Effects of material composition in construction waste sites on debris flow disasters induced by heavy rainfall
Mechanism of watershed environmental degradation impacts on debris flows along mountainous railway

Related Author

Cao Chunran
Chen Huayong
Robin Neupane
Li Huibin
Ruan Hechun
Liu Haitao
Chen Jiangang
Tao Ziqin

Related Institution

Key Laboratory of Mountain Hazards and Surface Processes, CAS/Institute of Mountain Hazards and Environment, CAS
University of Chinese Academy of Science
CAS Center for Excellence in Tibetan Plateau Earth Sciences, Chinese Academy of Sciences
Key Laboratory of Mountain Hazards and Engineering Resilience,Institute of Mountain Hazards and Environment, Chinese Academy of Sciences
Institute of Mountain Hazards and Environment, Chinese Academy of Sciences
0