您当前的位置:
首页 >
文章列表页 >
Function of Series of Sill Arrester Dams to Detain Sill in Velley of Middle Reaches of the Yellow River
    • Function of Series of Sill Arrester Dams to Detain Sill in Velley of Middle Reaches of the Yellow River

    • Bulletin of Soiland Water Conservation   Vol. 12, Issue 3, Pages: 24-28(1993)
    • Published:1993

    移动端阅览

  • Fang Xuemin, Zeng Maolin, Zuo Zhongguo. Function of Series of Sill Arrester Dams to Detain Sill in Velley of Middle Reaches of the Yellow River[J]. Bulletin of Soiland Water Conservation, 1993, 12(3): 24-28. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1247

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Opinions on Demonstration and Test of Warp Land Dam System Construction
Sequential Mathematical Model for Warping Dam Construction Based on Maximal Economic Benefit
Causes and mitigation measures of group-occurring slope debris flows in Mentougou District, Beijing City
Structure and variation characteristics of agricultural non-point source pollution in Qinghai Province from 2009 to 2023
Influence of soluble salt content on strength of Ili loess under wet-dry cycle conditions

Related Author

XUE Shun-kang
WANG Da-xiang
HE Xing-zhao
SHI Dan
CHEN Gang
JIN Shanghai

Related Institution

Water Conservancy Bureau of the Upper and Middle Reaches of the Yellow River
Xi’an University of Technology
Upper and Middle Reaches Bureau of YRCC
0